Our wells:
Reynolds specializes in large diameter bored wells constructed of 30 inch fiberglass casing. Large diameter wells take advantage of slow producing aquifers that are prevalent in Central, North Central and Eastern Illinois by making a large reservoir capacity available. The reservoir can then be pumped when needed and recover in the interim. These wells are also excellent in higher producing formations. Bored wells are also recommended when there is no deep water, or when the deep water contains unacceptable amounts of minerals and gasses such as methane, sulfur, iron, calcium, etc.
Fiberglass :
Reynolds
has led the industry in Central Illinois by offering fiberglass
casing since July of 2000. The casing is manufactured by GP
Fiberglass in Saskatchewan, Alberta, Canada, where it has been in
use for many years. You can contact their National Sales
Manager, Mr. Dale Klassen at (403) 990-1324, and/or click on the link
provided to view their web page.
There are many advantages to
using fiberglass casing as opposed to the old industry standard of
concrete tiles:
Tile wells are open bottom, frequently
allowing fine silts and sands to heave up into the well causing
reduced capacity, turbidity in the water from particles in
suspension, and even sometimes reach the pump or footvalve and cause
a shut down of the well and damage to the pump. The fiberglass
casing has a bottom cap, which alleviates these problems.
Water
intake in a concrete tile well is through the open bottom and through
the joints between each tile, there are no options. The
fiberglass casing is slotted in the field by the drilling crew so
that the amount and location of the slots is optimized to the
formations encountered while drilling the well, creating a
conventional casing / screen well design.
When drilling an
open borehole and setting concrete tiles, it is difficult or
impossible to drill below a caving formation, which is usually the
water-bearing zone of sand and gravel. consequently the well
can't be drilled much below the uppermost water bearing zone.
This is due to the length (3 feet) and weight (800+ pounds) of the
tiles, and the difficulty of setting them under water. By
contrast the fiberglass casing is 25 feet long and weighs only 400
pounds. Using fiberglass casing and a "flood drilling"
method which holds the borehole open with hydraulic pressure we can
usually drill through the caving zones and set the casing to the
bottom, which produces more reservoir and frequently intercepts a
second producing zone of water.
The casing is approved
by the Illinois Department of Public Health for use in potable water
supplies, and carries the NSF (National Sanitation Foundation) seal.
EYNOLDS
WELL DRILLING
IS YOUR COMPLETE GROUND WATER CONTRACTOR IN BUSINESS IN SPRINGFIELD SINCE 1972.
(800) 578 6932
(217) 629-9430 or E-mail: Reynolds Well Drilling
Home ________ Pump Installation & Service ________ Water Conditioning ________ Well Abandonment
This page created with OpenOffice
3.0(Linux)
Problems with this page?
Contact: D. B. Armitage.
This page last updated on February 14,
2009.
Photos & Logos © RDC